True-Roll Surface Engineering
Ball speed and break consistency depend on infill density, pile direction, and subsurface contour precision. We engineer each putting surface with a compacted base contoured to your specified breaks and calibrate infill application to achieve Stimpmeter readings in the range you request — from slower practice-pace to faster tournament-speed surfaces.







